Open up
Open up disconnected rooms
Remove walls between rooms to create a larger, more connected space. For example, bring a separate kitchen and dining room together.
Side-return extension and flat renovation Clapton, E5
HOME RENOVATIONS
HOME RENOVATIONS
When rooms feel too small, keep the family apart or need updating, a renovation can bring spaces together, make better use of the space you have and bring your home up to date.
When rooms feel too small, keep the family apart or need updating, a renovation can bring spaces together, make better use of the space you have and bring your home up to date.
30 Years In Construction
250+ Homes transformed
Prefer to chat now? Message us on WhatsApp
Federation of Master Builders
Independently vetted & inspected
Insurance-backed warranty available
What we take on
You can keep the layout as it is or change it, with or without structural work.
The building work typically starts from £60,000 including VAT, with the kitchen, bathrooms and finishes you choose on top.
We don’t normally take on a single kitchen or bathroom on its own.
Ways to renovate
Ways to renovate
You don’t always need more space. Changing how your rooms are arranged, updating what you already have, or combining both can make your home work much better.
Homeowner interview
HOMEOWNER INTERVIEW
Our client Genevieve talks through her flat renovation and side-return extension in Clapton, why she chose Construct X Group and what it was like having us work on her home.
“You guys were just heads and shoulders apart from all the others. You were really good at listening, and you made it clear that you’d be doing what I wanted to do, not what you thought I should do.”
MORE FROM GENEVIEVE’S HOME
OUR transformations
Explore real renovation projects, the decisions behind them, what they cost and how long they took.
OUR transformations
OUR transformations
Explore real renovation projects, the decisions behind them, what they cost and how long they took.
Why renovate your home?
WHY RENOVATE
Most homeowners we’ve spoken to renovate for at least two of these three reasons.
COMFORT
Insulating the floors and walls and replacing old windows can help your home hold its heat. Sound insulation between the floors can also keep more of the living room noise downstairs.
LAYOUT
Open up the ground floor into one kitchen and family room, or add a utility room and a downstairs WC, so every room works for the way you live.
CONDITION
Old wiring, plumbing and dated kitchens and bathrooms are easier to replace together, while the floors and walls are already open, rather than one room at a time.
Renovation costs
Renovation costs
Two homes of the same size can cost very different amounts to renovate. Keeping the rooms where they are is one job. Moving walls, relocating a kitchen and rebuilding the floors is another.
Example of how we set out your quote
Site setup, protection and strip-out
Structural work, steel beams and floors
Electrics, plumbing, plastering and fitting
Structural engineer
Specialist fitting and installations
Kitchen units, appliances and tiles
Building Control and Party Wall surveyors
Our typical project size
£60,000+
Including VAT. Not a price for renovating an entire house.
We’ll show you what we’ve found, explain what needs doing and agree the cost with you before the additional work goes ahead.
Work that couldn’t be seen or priced at the survey.
For example, old plaster that comes away when the wallpaper is stripped, or hidden rot, damp, old pipes or unsafe wiring found once the floors are up.
Where the survey shows a real risk, we suggest a contingency for that item rather than adding a blanket percentage to every quote.
If you decide to change something during the work, we price it and agree it with you in the same way.
The work involved can be very different from one home to another. These are some of the things that affect the price.
Changing the layout
Less work: Keep existing walls and room positions
More work: Remove load-bearing walls, install steel beams or move the kitchen
Each load-bearing wall that comes out needs a steel beam designed by a structural engineer, and temporary props while it goes in. Sometimes the posts that carry it need a new foundation too. When a kitchen or bathroom moves, the drains, the hot and cold supplies and the heating pipework move with it.
Changing the layout
Floors and heating
Less work: Keep a suitable existing floor
More work: Dig out and rebuild the floor, with insulation and underfloor heating
Digging out an old concrete floor to insulate it and lay underfloor heating adds around 3–4 weeks’ work. We often recommend it, because laying the heating on top of an uninsulated floor raises your floor level and loses heat into the ground.
Floors and heating
Kitchens and bathrooms
Less work: Standard fittings in existing positions
More work: Move pipework, fit concealed plumbing or intricate tiling
A straightforward bathroom is different from one with concealed pipework, intricate tiling and made-to-measure fittings. Even when you buy the products, the installation work can differ.
Kitchens and bathrooms
Living through the work
Less work: Work throughout an empty home
More work: Work in stages while you stay at home
If you stay, the floor we’re working on is sealed off from the one you’re living on with temporary partitions and doors. Renovating a floor at a time takes longer and can cost more than doing the whole house in one go.
Living through the work
How payments work
How payments work
How you pay: A 20% deposit when you sign the contract, then around ten stage payments as the work is done, with the last 5% once everything is finished and snagged.
How you’re protected: Before key stage payments, an independent inspector you appoint checks our work.
Renovation timings
Renovation timings
Allow approximately
3–6 months
from committing to your project to a finished renovation.
STEP 1
After your first call
Eddie visits to look at the condition of the house, the access and the structure, and to go through whatever drawings, layouts or ideas you have. Full architect’s drawings help, but a clear idea of what you want is enough to start.
STEP 2
After the survey
We prepare an itemised quote from the survey and what you’ve told us. You don’t need to have chosen every fitting and finish first. Anything still to be decided goes in as an allowance, which goes up or down once you’ve chosen, and any change is agreed with you before that work starts. The rest of the quote is a fixed price.
STEP 3
Usually 1–2 weeks, if needed
If a load-bearing wall is coming out, our structural engineer designs the steel beam that takes its place and prepares the drawings. For one or two openings with a clear layout, that’s usually all the design you need. If you’re changing the layout more widely, we can bring in an architect.
STEP 4
Before your start date
Where Building Control is needed, such as when removing a load-bearing wall, we help you appoint the appropriate inspector and arrange inspections as the work progresses. The Building Control fee is paid separately.
If a new steel beam will sit in a wall you share with a neighbour, you may need a . We can give you a notice template and recommend a surveyor, but you serve the notice and agree it with your neighbour. Any surveyors’ fees will be separate from the construction price. We recommend starting as soon as you’ve signed, as this can drag on quite a bit and risk delaying your start date.
STEP 5
Before we start on site
Kitchens, worktops, specialist glazing and anything made to order have lead times, so choose them early, before we start on site wherever you can. Send us the product links and we’ll check the sizes and the fit before you order.
STEP 6
Usually 8–15 weeks
An empty three-bedroom house, rewired and replumbed with a new kitchen and two bathrooms, typically takes 8–12 weeks. The same house renovated a floor at a time while you live in it takes 10–15 weeks. A substantial ground floor on its own, with a structural opening, a new kitchen and new finishes, usually takes around 8 weeks. If the floor is dug out and rebuilt for underfloor heating, this can take 12 weeks or more.
What could affect the timeline?
A notice that drags on can delay the start. During the work, problems found once the wallpaper is off and the floors are up, or a kitchen or worktop ordered late, can add time.
A newly laid floor also needs time to dry before the finish can go down.
We’ll flag potential delays as early as possible.
During construction
During construction
Here’s how a substantial ground-floor renovation might unfold when we’re removing walls, rebuilding the floor and fitting a new kitchen. Some stages overlap, and not every renovation needs all of them.
Usually 11–12 weeks when the floor is rebuilt, 8 weeks when it isn’t.
On site
We protect the areas you’re keeping, set up the site and remove the old kitchen, flooring, wallpaper and anything else that’s going. If we’re removing walls, we measure up and order the steel beams.
At home
Before we start, we agree which rooms you can still use and how you’ll get in and out. If you’re staying, we can separate the working areas with temporary walls and doors. If we’re renovating the whole house at once, it’s usually not practical to live there during the work.
On site
We put temporary supports in place, remove the agreed load-bearing walls and install the steel beams designed by the structural engineer. If the beams need new foundations to support them, we build those first.
At home
Once the new openings are in place, we can check the room measurements with your kitchen supplier before the kitchen is made. We also arrange the necessary Building Control inspections.
On site
If we’re rebuilding the floor, we dig out the old concrete and move any drainage that needs changing while the ground is open. We then build the new floor and internal walls, run the electrical cables and plumbing, and install underfloor heating where included.
At home
We’ll go through socket, switch and lighting positions with you before we close up the walls. Water, electricity or heating may need to be turned off during some of this work, but we’ll let you know about planned interruptions in advance.
On site
We install the insulation, put up plasterboard where needed and plaster the rooms. If the existing plaster is in good condition, we can keep it and skim over it. If it’s loose or badly damaged, we’ll discuss whether it needs replacing.
At home
Your rooms start taking shape again. By now, your kitchen, bathroom fittings, tiles and flooring should be ordered so they’re ready when we need to fit them.
On site
We fit and connect the lights, sockets, radiators and bathroom fixtures, then install the kitchen, flooring, doors and skirtings. A typical kitchen takes 2–5 working days to fit once the room and units are ready.
At home
If you’ve chosen stone worktops, a specialist measures up after we’ve fitted the kitchen units. They then make the worktops and return to install them. We also usually complete bathrooms one at a time, so we’ll plan the work around the facilities you need.
On site
We finish the decorating, check our work and put right anything outstanding. We also arrange the relevant electrical, gas and Building Control completion documentation.
At home
We’ll ask you to make a list of anything you’d like us to check before we walk through the finished rooms together. We remove any remaining waste and clean up the areas we’ve worked in. If you’d like a professional deep clean, we can arrange that separately.
You’ll speak with Eddie
Planning & approvals
Planning & approvals
Most changes inside your home don’t need planning permission. But structural alterations, new drainage or work to a shared wall can bring other requirements. We’ll explain what applies to your project and what we can help arrange.
Planning permission
Usually not for work inside your home, even when you’re moving or removing internal walls.
If you’re changing the outside of the property, we’ll check whether planning permission is needed.
Listed buildings
Changes that affect the character of a listed home can need listed building consent, even inside it. That could include removing walls or altering original features.
We’ll help you identify what needs checking before work starts.
Building regulations
Removing load-bearing walls, changing drainage and certain electrical work must meet Building Regulations.
Where Building Control is needed, we help you appoint the inspector, arrange inspections during the work and coordinate the completion sign-off. You pay the Building Control fee separately.
Party wall
If we’re putting a steel beam into a wall you share with a neighbour, you may need to serve a Party Wall notice, even if planning permission isn’t needed.
We can provide a notice template and recommend a surveyor, but you’re responsible for arranging the formal Party Wall process. Surveyors’ fees are paid separately.
Structural engineer
If we’re removing a load-bearing wall, a structural engineer works out how to support the weight above and prepares the drawings we build from.
We can arrange our own engineer. Straightforward designs usually take 1–2 weeks, and their fee is itemised in your quotation.
Flats
If your flat is leasehold, you may need written consent from your freeholder, depending on what your lease says.
If the work affects a wall or floor shared with other flats, the Party Wall process may also apply, including neighbours above or below you.
“We recently used Construct X for a major project at our home, including the construction of an extension and a complete renovation of most of the ground floor.”
The work involved significant structural changes, including excavating the existing floor to install insulation and underfloor heating throughout, and we have been extremely pleased with both the process and the finished result.
The quality of workmanship has been excellent. The extension is spacious, well-constructed and blends beautifully with the existing property, while the ground floor renovation has completely transformed the way we use our home. Great attention was paid to detail, and the standard of finish exceeded our expectations.
A particular mention should go to Eddie, Ben and the wider team. They were always friendly, professional and courteous, making what could have been a very disruptive project far easier to manage. Communication was clear throughout, and they were consistently willing to listen, offer advice and adapt to changes in the plans. Whether alterations were needed because of unforeseen circumstances or simply to improve the overall design, they approached every challenge positively and constructively.
Their flexibility, problem-solving approach and commitment to achieving the best outcome were evident from start to finish. It was clear they took genuine pride in their work and cared about delivering a result that we would be happy with for years to come.
We would have no hesitation in recommending them to anyone considering an extension, renovation or major building project.
They delivered a high-quality result, were a pleasure to work with, and made a complex project as smooth and stress-free as possible.
Thoroughly recommended.
Our family
Construction has been our family trade for the past 30 years. Your project is led by our family alongside professionals we’ve worked with for years.
Building work involves a lot of different people. Our own trades work alongside the architects, engineers and specialists your project needs, all managed by our family. You have one point of contact throughout your project, without having to coordinate everyone involved yourself.
OUR FAMILY
Construction has been our family trade for the past 30 years. Your project is led by our family alongside professionals we’ve worked with for years.
Building work involves a lot of different people. Our own trades work alongside the architects, engineers and specialists your project needs, all managed by our family. You have one point of contact throughout your project, without having to coordinate everyone involved yourself.
HOMEOWNER EXPERIENCES
HOMEOWNER EXPERIENCES
100% of our reviews have received 5‑star ratings.
Homeowner guides
HOMEOWNER GUIDES
Explore our human written guides on planning, approvals, costs and the decisions that come up during home renovation projects.
“All our articles were written by me with Eddie’s input, not AI.”
FAQs
FAQs
Get a realistic picture of what’s possible for your home, likely costs, timings, planning requirements and what the project would involve.
You’ll speak with Eddie
Managing Director
150+ projects delivered
Expert advice · No obligation

Get a realistic picture of what’s possible for your home, likely costs, timing, planning requirements and what the project would involve.

You’ll speak with Eddie
Managing Director
150+ projects delivered
Expert advice · No obligation