Construct X Group

Leytonstone, E11 · end-of-terrace

Adding a fourth bedroom before selling the family home.

The homeowners planned to sell their Leytonstone home and move to Denmark, but wanted to make one final improvement first. We converted their unused loft into a master bedroom with an en-suite, giving the house a fourth bedroom and freeing up the small box room for a home office.

Space created
Loft suite and home office
Est. cost (inc. VAT)
£72,000+
Time taken
11 weeks
Added area
28 sqm
Project type
Rear dormer loft conversion
Planning route
Permitted development + lawful development certificate

The transformation

How the home changed

The homeowners already had three bedrooms on the first floor, but the smallest was a box room. With plans to move abroad and eventually sell, they wanted to make the house more appealing to a family who might need more space.

The loft had enough headroom to be converted without lowering the ceilings below. By building a rear dormer, we could add a new main bedroom and en-suite while keeping the existing bedrooms.

The staircase was positioned above the original stairs. We moved part of the box-room entrance further into the room to give the new staircase enough space without taking anything from the two larger bedrooms.

The couple moved into the loft, their daughter kept her bedroom, and the box room became a home office.

Before

Three first-floor bedrooms

Existing first-floor and loft plans: the bathroom, stairs, two larger bedrooms and the small box room at the front (left); the empty loft (right).
  1. Small third bedroom: The smallest bedroom was a box room, with limited space compared with the other two bedrooms.
  2. Unconverted roof space: The loft wasn’t being used as living accommodation.

After

Loft suite and office

Proposed first-floor and loft plans: new loft stairs above the existing flight and the box-room wall moved (left); the new bedroom, en-suite and stairs (right).
  1. New staircase: The stairs follow the existing stairwell, with part of the box-room entrance moved to create enough space.
  2. Master bedroom: A rear dormer provides the additional headroom needed for the new main bedroom.
  3. En-suite wet room: A separate bathroom sits alongside the bedroom, with its own window.
  4. Home office: The former box room could now be used for working from home.

Design approach

Making the loft their own

Keeping the original chimney

The homeowners wanted a modern bedroom, but they also wanted to keep some of the house’s original character.

The existing chimney breast was one of the features they chose to leave visible. Rather than covering it with plasterboard, we exposed the brickwork and repaired the damaged areas so it could be painted.

They chose pale blue walls, decorative wall lights and herringbone flooring. The flooring, artwork and light fittings were selected by the homeowners, while we carried out the installation and decoration.

A structural timber post was also left visible, treated with a fire-protective coating and painted blue to match the room.

Rear dormer loft conversion bedroom in Leytonstone, E11, with a pale blue chimney breast and two Velux rooflights.

Making room for wardrobes and rooflights

The bedroom has two large Velux rooflights on the front roof slope.

Their positions were considered alongside the fitted wardrobes, which were planned for the space beneath the sloping ceiling on the opposite side.

We worked with specialist joiners to make and install the wardrobes, following the shape of the roof rather than filling the room with freestanding cupboards.

That gave the homeowners storage without taking up the main bedroom floor.

Pale blue fitted wardrobes built under the sloping roof beside a Velux rooflight, with the bedroom entrance and the blue en-suite beyond.

Choosing a Juliet balcony

The original drawings showed a window at the back of the new bedroom.

During construction, the homeowners asked to replace it with aluminium sliding doors and a Juliet balcony.

The external design team was consulted about the change, and we supplied and installed the new doors as an agreed variation.

Instead of a traditional metal railing, the homeowners chose a glass balustrade. This leaves a clear view across the gardens when looking out from the bedroom.

A Juliet balcony doesn’t have a platform to step onto, but the full-height doors can be opened for fresh air.

Full-height black aluminium sliding doors with a Juliet balcony at the back of the bedroom, looking out over the neighbouring gardens.

Making the most of the internal doorways

The homeowners also chose pocket doors for the bedroom and en-suite.

Unlike ordinary hinged doors, pocket doors slide into the wall when opened, so there isn’t a door swinging into the room.

The bedroom entrance needed a fire-rated system because it formed part of the relevant escape route. We installed an Eclisse fire-rated pocket door there, with a separate standard pocket door for the bathroom.

Both were client-requested upgrades.

The bathroom installation required more work than fitting a conventional hinged door because the wall needed to accommodate the sliding mechanism.

Looking from the bedroom into the blue en-suite, with its basin, round red mirror and WC.

A blue wet room from floor to ceiling

The homeowners chose blue microcement for the walls and floor of their en-suite.

They wanted a walk-in shower without a raised shower tray, so the shower floor runs flush with the rest of the bathroom and drains through an opening in the floor.

We also fitted a recessed niche for shower products, contemporary sanitaryware and a red radiator that contrasts with the blue finish.

The homeowners supplied the sanitaryware and shower screen. We supplied and installed the microcement finish through our specialist team and fitted the remaining bathroom elements.

Microcement can create a continuous surface without the usual tile joints, but the preparation underneath is particularly important when the bathroom sits on a timber floor.

We discussed those risks with the homeowners before carrying out the additional structural preparation.

The blue microcement wet room, with a walk-in shower, a recessed niche, a black shower column and a flush floor drain.The en-suite’s WC and black-framed window, with a red towel radiator against the blue microcement walls.

The build

Building the new loft

Supporting the new floor and roof

The structural work began with four steel beams.

Three supported the new loft floor, while the fourth supported the altered roof structure.

With the new structure in place, we built the rear dormer and finished the outside with imitation-slate cladding and a three-layer felt roof.

One part of the roofing work needed particular care.

The existing house had natural slate tiles, and installing the two large front rooflights meant opening up a substantial section of the front roof.

Rather than replacing the entire front covering, we carefully removed and kept usable slates from the rear roof. These were then reused around the new front rooflights.

This allowed us to complete the alterations while retaining more of the original roof covering.

The rear dormer in Leytonstone, E11, from the garden, clad in slate-effect tiles, with black sliding doors behind a glass Juliet balustrade.

Fitting the staircase

The new staircase followed the position of the existing stairs below.

The homeowners chose to upgrade the standard MDF treads and risers to pine. The handrail, spindles and posts were also made from pine, as specified.

We painted the staircase white and left the timber handrail with a natural finish.

A skylight above the stairs was part of the original quotation. It brings daylight down into the stairwell, which would otherwise have relied more heavily on artificial lighting.

The new loft staircase rising from the first-floor landing, with white spindles, newel posts and a curved soffit.The skylight above the loft staircase, with a hanging textile, globe wall lights and the white balustrade below.

Repairing the chimney brickwork

When we removed the old plaster from the chimney breast, the brickwork underneath was in poor condition.

Some bricks were badly weathered and needed replacing. Our bricklayers repaired those areas and repointed the surrounding masonry before the chimney was decorated.

Because the homeowners intended to paint the brickwork, we didn’t need to source bricks that matched every original colour. The important thing was to leave the chimney sound and ready for its new finish.

The bed against the exposed brick chimney breast, painted pale blue to match the walls, with a wall light, bedside tables and a rooflight above.

Preparing the wet room floor

The blue wet room needed more preparation than a conventional tiled bathroom.

The challenge was the timber floor beneath it.

Timber can move slightly as temperature, moisture and loads change. That movement can affect rigid finishes applied above it, including microcement.

We explained that a conventional tiled bathroom floor would present less movement-related risk. The homeowners preferred the continuous microcement finish, so we agreed additional preparation before proceeding.

We strengthened the floor with extra timber supports and metal strapping, then installed marine-grade plywood over the reinforced structure.

The wet room was also fully tanked, meaning a waterproof layer was installed beneath the decorative finish to stop water reaching the structure below.

Our regular bathroom specialist worked with a separate microcement team to coordinate the preparation and installation.

The additional work was intended to reduce the risk of cracks caused by movement. It couldn’t eliminate that risk entirely.

The homeowners were advised of this and chose to proceed. They later reported no problems with the completed bathroom.

Staying at home during the work

The homeowners and their young daughter remained living in the house throughout the conversion.

Because the existing first-floor ceilings didn’t need to be lowered, the family could continue using the bedrooms and living spaces below.

There was construction noise, but they didn’t need to move out while the new rooms were being built.

Waste removal needed some planning because the road was within a Controlled Parking Zone, making skip permits relatively expensive.

Rather than keeping a skip outside throughout the build, we stored waste safely within the scaffold arrangement and arranged collections when a full load was ready.

Skips typically remained outside for only four or five days, reducing the time we needed them on the road.

Eight weeks of construction and three weeks of finishing

The core loft conversion took 8 weeks.

The homeowners’ chosen specification went beyond the standard build, with bespoke joinery, upgraded flooring, specialist microcement and full decoration.

Completing that additional work took another 3 weeks.

The full project was completed in 11 weeks.

There were no major unforeseen construction complications.

Planning & approvals

What needed approval

Planning permission

The project included a rear dormer and two front rooflights. Waltham Forest Council granted a Lawful Development Certificate confirming the work was permitted development.

Party Wall

A formal Party Wall Award was agreed for one neighbouring property.

Building Control

Building Control inspected the loft conversion and issued a completion certificate when the work was finished.

What is permitted development + lawful development certificate?

Permitted development allows certain changes to a home without applying for separate householder planning permission, provided the work meets the relevant rules.

A Lawful Development Certificate, or LDC, is the council’s formal confirmation that the proposed work is lawful.

For this rear dormer loft conversion, Waltham Forest Council issued a Lawful Development Certificate before the work began.

What is a Party Wall Award?

Some building work near a neighbouring property falls under the Party Wall process.

When the relevant notices have been served and an agreement cannot simply proceed through written consent, appointed surveyors may prepare a Party Wall Award.

The award records matters such as the work being undertaken, how it should proceed and measures to protect the neighbouring property.

Read our Party Wall guide →

What does Building Control do?

Building Control checks that building work meets the relevant Building Regulations.

These include requirements for structural safety, fire safety, insulation and other aspects of construction.

It’s separate from planning permission.

Costs today

What this project costs

£72,000+

Estimated base cost today · Includes VAT

What the base price covers

Our rear dormer starting price covers the core loft conversion, including the structural work, roof construction, staircase and the standard elements needed to turn the roof space into a usable room. The full specification is available in the breakdown below.

This loft went beyond that standard specification. Alongside the new bedroom and en-suite, the homeowners chose specialist bathroom finishes, fitted wardrobes, upgraded doors, herringbone flooring and full decoration. A similar project today would need to be priced around those choices.

What this home added

The homeowners made several changes to the original specification during the project.

The rear bedroom window was replaced with aluminium sliding doors and a glass Juliet balustrade. They also chose pine stair treads and risers, fitted wardrobes made for the roof slope, and two pocket doors, including a fire-rated system for the bedroom entrance.

The blue microcement wet room required specialist installation and additional floor preparation. We also installed the homeowners’ chosen flooring, lighting, radiators and bathroom fittings, and decorated the loft throughout.

Not every item above was an additional charge. The homeowners supplied some of the finishes and fittings themselves, while other work was included in the agreed construction package.

What’s included?

Rear Dormer

Typically £72,000+ including VAT

This starting price is based on a typical mid-terrace house, with a rear dormer around 5 metres wide, creating one bedroom and a shower room.

It assumes there’s enough roof height and no unusual structural work is needed.

What’s included

What isn’t included?

Bathroom fittings and tiles, final bedroom flooring and decorating are separate.

We can arrange the flooring and decorating if you’d like us to.

Design and statutory approval fees aren’t automatically included in the headline build price.

What can change the price?

Roof height

If there isn’t enough headroom, we may need to lower the ceilings on the floor below. This adds structural work and affects the existing rooms.

House size and access

A wider loft needs more materials, although small differences may not change the price. Some houses also need extra scaffolding or have restricted access.

Structural work

The structural engineer may specify additional steelwork, particularly where existing roof timbers or chimneys affect the design.

Where the staircase goes

If the new staircase can’t fit above the existing one, we may need to change walls or rooms on the floor below to make space.

The existing roof

Rotten timbers or damaged roof coverings may need replacing. You can also choose to renew the existing front roof while the scaffolding and roofing team are already there.

Weather protection

A temporary roof, known as a tin hat, helps protect the house while the existing roof is open. We strongly recommend one in wetter months and for L-shaped dormers. It may be included in your quote or priced separately.

Windows and rooflights

Additional windows, larger openings or specialist glazing can increase the materials and installation work.

Bathrooms and drainage

A second bathroom adds plumbing and installation work. Even one bathroom can cost more if the waste pipes can’t connect easily to the existing drainage.

Existing plumbing, heating and electrics

An existing boiler, water supply or electrical consumer unit may need upgrading to serve the new rooms safely and properly.

Fire safety in the existing house

Depending on the approved fire-safety design, some existing doors on the floors below may need replacing. These aren’t automatically included in the standard loft price.

Key takeaways

Key takeaways

Think about the whole house before selling

Adding another bedroom can change how the existing rooms are used.

In this home, moving the main bedroom upstairs allowed the smallest bedroom to become an office. The property still offered four rooms that could be used as bedrooms, but the family could use them differently while they lived there.

If you’re extending before selling, it can be worth asking local estate agents what prospective buyers are likely to value, rather than assuming that additional floor area is always the most important factor.

Check where the staircase will go

A loft conversion needs a staircase, and that staircase has to connect to the rooms below.

Here, moving a small section of the box-room entrance made enough space for the stairs without losing one of the larger bedrooms.

It’s worth understanding how the staircase will affect your existing floorplan before deciding on the loft layout.

Understand what’s beneath your bathroom finish

A continuous microcement floor can look simple once the bathroom is finished, but the work underneath it matters.

The floor needs to be suitably prepared and waterproofed, particularly when the bathroom is being built over timber.

If you’re considering a similar finish, ask how movement, waterproofing and the shower drainage will be dealt with before choosing the final materials.

Allow time for the finish you want

The core loft conversion took 8 weeks, but the full project took 11 weeks once the additional interior work was included.

Bespoke wardrobes, specialist bathroom finishes, flooring and decoration all take time.

When comparing building programmes, check whether you’re being given a timeframe for the structural conversion or for the finished rooms you actually want to move into.

Photos and floor plans

Proposed first-floor and loft plans: new loft stairs above the existing flight and the box-room wall moved (left); the new bedroom, en-suite and stairs (right).Rear dormer loft conversion bedroom in Leytonstone, E11, with a pale blue chimney breast and two Velux rooflights.The bed against the exposed brick chimney breast, painted pale blue to match the walls, with a wall light, bedside tables and a rooflight above.The loft bedroom looking towards the black aluminium sliding doors at the rear, with orange curtains, a chest of drawers and a herringbone floor.Full-height black aluminium sliding doors with a Juliet balcony at the back of the bedroom, looking out over the neighbouring gardens.Pale blue fitted wardrobes built under the sloping roof beside a Velux rooflight, with the bedroom entrance and the blue en-suite beyond.The bedroom seen from the bed, with the en-suite doorway on the left and the sliding doors at the rear of the dormer.The open en-suite doorway beside the rear sliding doors, with the basin, round red mirror and wall-hung vanity inside.Looking from the bedroom into the blue en-suite, with its basin, round red mirror and WC.The blue microcement wet room, with a walk-in shower, a recessed niche, a black shower column and a flush floor drain.The en-suite’s WC and black-framed window, with a red towel radiator against the blue microcement walls.The new loft staircase rising from the first-floor landing, with white spindles, newel posts and a curved soffit.The skylight above the loft staircase, with a hanging textile, globe wall lights and the white balustrade below.The rear dormer in Leytonstone, E11, from the garden, clad in slate-effect tiles, with black sliding doors behind a glass Juliet balustrade.

Ready to get a clear plan for your project?

Get a realistic picture of what’s possible for your home, likely costs, timings, planning requirements and what the project would involve.

You’ll speak with Eddie

Managing Director

Delivered this project

Expert advice · No obligation

Keep exploring

See more transformations

Side-return extension Side-return extension kitchen in Lewisham, SE6, with a grey island, butler sink, brass pendants and roof windows

Lewisham, SE6 · mid-terrace

An open-plan ground floor to reconnect a family.

Whoever was cooking was often cut off from the rest of the family. Opening up the kitchen, dining room and side return brought everyone together.

Est. cost
£74,000+
Time taken
12 weeks
Added area
11 sqm
Read the case study: An open-plan ground floor to reconnect a family.
Side-return extension Side-return extension kitchen in Clapton, E5, with dark green units, a wood-topped peninsula with two stools and a yellow splashback.

Clapton, E5 · multi-floor FLAT

Moving a kitchen upstairs to create a family hub.

This family’s flat had limited space to begin with, and they needed their kitchen closer to the main living space and a bigger family bathroom.

Est. cost
£74,000+
TIME TAKEN
12 weeks
ADDED AREA
6 sqm
Read the case study: Moving a kitchen upstairs to create a family hub.
Side-return extension Completed side-return kitchen extension in Greenwich, SE10, with a central island, pitched glass roof and exposed brick wall.

Greenwich, SE10 · mid-terrace

Reworking the ground floor around a wider kitchen.

A side-return extension gave this narrow kitchen enough width for a central island, with a glass roof bringing daylight into the new space.

Est. cost
£74,000+
Time taken
12 weeks
Added area
5 sqm
Read the case study: Reworking the ground floor around a wider kitchen.
Wraparound extension Wraparound kitchen extension in Haringey, N4 with a dark green island, pendant lights, roof windows and sliding garden doors.

Haringey, N4 · mid-terrace

A kitchen big enough for family and friends.

The separate dining room rarely got used. We made space to eat in the extended kitchen, freeing up the old room for a playroom.

Est. cost
£117,000+
Time taken
16 weeks
Added area
19 sqm
Read the case study: A kitchen big enough for family and friends.
Wraparound extension Navy kitchen island looking towards the living area and garden doors in a wraparound extension in Lewisham, SE13.

Lewisham, SE13 · mid-terrace

Turning a small kitchen into an open-plan family hub.

The homeowners had a young baby and a small kitchen cut off from the rooms around it. This extension gave them a hub to cook, eat, relax & play together.

Est. cost
£117,000+
Time taken
11 weeks
Added area
14 sqm
Read the case study: Turning a small kitchen into an open-plan family hub.
Rear extension Rear extension kitchen-diner in East Finchley, N2, with blue cabinets, a central island, rooflights and sliding garden doors.

East Finchley, N2 · Mid-terrace

An open-plan kitchen-diner to reconnect a family.

Whoever was cooking was often cut off from the rest of the family. We opened up the kitchen to the dining room, bringing everyone together.

Est. cost
£80,000+
Time taken
12 weeks
Added area
12 sqm
Read the case study: An open-plan kitchen-diner to reconnect a family.
Rear extension Open-plan rear extension kitchen in Lewisham, SE4, with a dark-blue island, a dining table, rooflights and bifold doors.

Lewisham, SE4 · mid-terrace

An open-plan kitchen & living space for a growing family.

The kitchen and dining room were too cramped for family life. We extended the rear and opened them up into one space for cooking, eating and relaxing.

Est. cost
£80,000+
Time taken
13 weeks
Added area
21 sqm
Read the case study: An open-plan kitchen & living space for a growing family.

What is a dormer?

A dormer is a structure built out from a sloping roof to create more usable space inside, usually with a taller wall and a window.

What is a Juliet balcony?

A Juliet balcony is a safety barrier fitted across an upper-floor door or large window opening. It allows the opening to be used for light and ventilation without creating a balcony platform you can step onto.

What is a pocket door?

A pocket door is a sliding door that disappears into a space inside the wall when opened.

Unlike a conventional hinged door, it doesn’t need clear floor space for the door to swing through.

This can be particularly useful in smaller bathrooms and rooms where every part of the layout matters.

What is microcement?

Microcement is a thin decorative coating applied over a prepared surface to create a continuous finish. It can be used on bathroom walls and floors, but the surface underneath needs careful preparation. Movement in a timber floor can increase the risk of cracking.

What is structural steelwork?

Steel beams and posts are used to support parts of a building where walls or openings are changed. They transfer the weight safely to the remaining structure and foundations.

What is tanking?

Tanking is a waterproof layer installed beneath bathroom finishes to stop water reaching the structure underneath. It’s especially important in walk-in showers where water falls directly onto the floor. Moisture-resistant plywood alone isn’t a substitute for tanking.